Home shelter up to 35 m² in Poland by notification: step by step (2026)

Що змінили польські будівельні правила, хто готує проєкт укриття біля приватного будинку, що подати в староство і яких помилок уникати.

Home shelter up to 35 m² in Poland by notification: step by step (2026)

Since early 2026, owners of single-family houses in Poland can place a detached home shelter (schron przydomowy) on their plot under a simplified procedure: a notification (zgłoszenie) instead of a building permit. Interest is high, but “simplified” does not mean “no paperwork”. Below we explain what the provision says, how to go through the procedure step by step and what to look for when choosing a ready-made shelter.

What the provision says

The amendment to the Construction Law of 4 December 2025 (Dz.U. 2025 poz. 1847) added point 2a to Article 29(1). It provides that a detached home protective structure of up to 35 m², intended for the residents of a single-family house, requires a notification rather than a building permit. The rules took effect around 7 January 2026.

Three conditions are key:

  • detached — this is not about converting a basement or a room inside the house;
  • up to 35 m² — a larger structure needs a standard building permit;
  • for the residents of a single-family house — the route does not cover businesses, housing communities or municipalities.

A notification does not remove the need for a design. The county office receives documentation prepared by a licensed designer.

Step by step

  1. Check the plot. Confirm the local zoning plan or development conditions, distances from boundaries and buildings, and whether a truck and crane can reach the plot. For an underground shelter, check the groundwater level.
  2. Choose the type. An above-ground shelter sits on a prepared base and is installed faster. An underground one needs excavation and waterproofing but gains extra cover from the soil.
  3. Commission the design. A licensed designer prepares the documentation using the manufacturer's technical data. Decide at this stage whether the structure will be an ukrycie or an airtight schron with filtered ventilation, as this affects both the design and the cost.
  4. File the notification. The notification and its attachments go to the county office (starostwo powiatowe), or the city office in cities with county rights. Confirm the exact list of documents with the office.
  5. Wait for no objection. The Construction Law gives the authority 21 days to object (sprzeciw). If it does not, work can begin.
  6. Prepare the site and book installation. The base, utility connections and access should be ready before the modules arrive.
  7. Accept the shelter. After installation, check the equipment and keep the technical documentation: you will need it for inspections and if you sell the house.

Your designer will also tell you whether a site manager and a construction log are required for the project.

What the rules still lack

The Ministry of Development and Technology (MRiT) announced separate technical conditions for home protective structures. As of November 2026 we could not confirm that they have been issued. Until they are, designers often refer to the MSWiA regulation on technical conditions for protective structures (Dz.U. 2025 poz. 1548), which requires, among other things, at least 1 m² per person. Before filing, it is worth asking the county office which requirements it expects.

How to count 35 m² and which models fit

For the area limit it is safer to count the external footprint, not the usable floor area inside. The final interpretation rests with the designer or the county office. Two compact Hobbit House models have external dimensions in this range:

ModelTypeExternal dimensions (L × W × H)Internal area
Fortetsia 2.25 XLabove-ground, single module5,930 × 3,980 × 2,840 mm4.05 m²
Hobbit 2.0underground4,900 × 2,460 × 2,885 mm9.27 m²

The capacity stated in our documentation follows Ukrainian standards. The number of people under Polish rules, at least 1 m² per person, is recalculated by the designer. Larger Fortetsia models, such as the 2.25 2XL, have an external footprint above 35 m², so they will need a building permit. Full specifications are in the shelter catalogue.

Fortetsia is a reinforced-concrete module with 300 mm walls of C35–C45 concrete. Installation is quick because a finished factory-made structure arrives on site. Hobbit 2.0 is an underground shelter designed for private properties; it requires excavation, and for underground installations we also carry out the earthworks and waterproofing.

Above-ground or underground at home?

An above-ground option needs far less earthwork, is installed faster and, if you move or replan the plot, can be dismantled and relocated. An underground option blends into the garden and benefits from the cover of the soil, but it is sensitive to groundwater and needs careful waterproofing. Bear in mind, too, that the MSWiA regulation reserves the highest shelter categories, S-2 and S-3, for underground structures. The choice therefore depends on the level of protection you expect, the ground conditions on the plot and your budget.

Common mistakes

  • Measuring from the inside. A structure with 30 m² inside can exceed 35 m² by its external footprint.
  • No access. A finished module has to be delivered and placed by crane. A narrow gate, soft ground or overhead power lines can complicate installation.
  • Ignoring groundwater. For underground shelters this is the most common cause of extra costs.
  • Confusing schron and ukrycie. Airtightness and filtered ventilation are separate requirements. Without them, a structure is an ukrycie under the Civil Protection Act.
  • Using the route for a business. The notification procedure applies to residents of a single-family house. A shelter for a workplace follows the standard procedure.
  • Buying before the design. The designer should have the data of the specific model before the notification is filed, not after delivery.

Is there funding for home shelters?

We found no grant programme or tax relief for private individuals building home shelters (as of November 2026). Grants under the Civil Protection Act, which can reach 100% of the cost, apply to protective structures designated by the head of the municipality, the county head or the voivode, and to local-government funding. If a programme for homeowners appears, we will update this article.

Frequently asked questions

Do I need a building permit for a garden shelter next to my house in Poland?

A detached home protective structure of up to 35 m², intended for the residents of a single-family house, requires a notification (zgłoszenie) rather than a building permit, under Article 29(1)(2a) of the Polish Construction Law (Dz.U. 2025 poz. 1847), in effect since around 7 January 2026. The notification still requires a design.

Can a company or a housing community build a shelter by notification in Poland?

No. The notification route for a home shelter of up to 35 m² applies only to the residents of a single-family house and does not cover businesses, housing communities or municipalities. A shelter for a workplace goes through the standard procedure, and a structure larger than 35 m² needs a standard building permit.

How long do I wait after filing a home shelter notification with the county office?

Polish Construction Law gives the authority 21 days to object (sprzeciw) to a home shelter notification. If the county office (or the city office of a city with county rights) raises no objection in that time, work can start; it is worth confirming the exact list of required attachments with the office beforehand.

Which Hobbit House shelters fit within the 35 m² limit?

Two Hobbit House models have external dimensions within the 35 m² limit: the above-ground Fortetsia 2.25 XL (5,930 × 3,980 mm) and the underground Hobbit 2.0 (4,900 × 2,460 mm). It is safer to measure the external footprint rather than the interior area; the final interpretation is confirmed by the designer or the county office.

Is there a grant or tax relief for a home shelter in Poland?

As of November 2026, no grant programme or tax relief for private individuals building a home shelter could be found. Grants under the Act on civil protection and civil defence, of up to 100% of costs, apply to protective structures designated by the wójt, starosta or voivode and to funding for local authorities.

How we help

Hobbit House has manufactured precast reinforced-concrete shelters since 2022 and has completed more than 1,500 projects in Ukraine. For clients in Poland we:

  • select a model to suit the plot and the number of household members,
  • provide the technical data and structural documentation the designer needs for the notification,
  • prepare a quote in PLN or EUR with a clear list of what is included,
  • deliver the modules and install the shelter.