Shelter project completed for a kindergarten

Shelter project completed for a kindergarten

In 2023, we received a request to install a shelter at a private kindergarten in Kyiv. The task was to create a permanent, safe and reliable shelter for the children and staff during air raid alerts. The best format was a two-module Fortetsia shelter, 2.25 m wide. Its protected area is nearly 18 square metres and it holds 29 people at a time. After quick manufacturing and installation, the kindergarten team decorated the structure in their own creative way.

Structure: Fortetsia 2.25 2XL

Capacity: 29 people

Location: private kindergarten, Kyiv

Specifications:

Wall and buttress thickness: 300 mm

Entrance on one side: hermetic doors for bomb shelters (thickness — 300 mm)

Entrance from the vestibule: reinforced hermetic doors

Interior decoration: designed and implemented by the client

This shelter provides a high level of protection and comfort, meeting all safety standards.

Shelter project completed for a kindergarten
Shelter project completed for a kindergarten
Shelter project completed for a kindergarten
Shelter project completed for a kindergarten
Shelter project completed for a kindergarten
← All projects
Media

News

All news →
09.11.2026Read

How Ukrainian Communities and Schools Can Procure Bomb Shelters Through Prozorro: A Step-by-Step Guide

How a community or school can buy a shelter via Prozorro: needs, market research, requirements, bidding, contract, installation and registration.
09.11.2026Read

Radiation Protection Shelters (PRU) in Ukraine: What They Are, Who Needs Them, and How They Differ from Mobile Shelters

What is an anti-radiation shelter (PRU), what standards govern its construction, how it differs from a shelter and a mobile shelter, and how to build a PRU from modules.
09.11.2026Read

How Long Does It Take to Install a Modular Bomb Shelter in Ukraine? A Timeline from Order to Delivery (Compliant with DSTU/DBN Standards)

Installation of the «Fortetsia» shelter for up to 50 people — up to 24 hours, from delivery to handover — up to 7 days. Stages, site preparation, and documents after installation.