Media
Open the channel Video
Blast tests, production and real sites.
Fortetsia 4.0 shelter installation video — turnkey reinforced-concrete structure in 24 hours
Shorts
All videos
Fortetsya 3.5 3XL installed. Modular shelter certified under DSTU 9329:2025 — 24 hours from delivery to handover.
INSTALLATION OF THE UNDERGROUND STRUCTURE “FORTRESS 3.5”
Testing of Hobbit House “Fortress” shelters — 300–500 kPa and a 120-mm mortar explosion
What is a buttress in a Hobbit House shelter?
Durable HOBBIT HOUSE Shelter: How We Achieve a High Level of Protection
HOBBIT 2.0 SHELTER STRENGTH TEST (152 CALIBER DIRECT HIT)
Installation of the "Fortress 3.5 9XL" shelter
Installation of shelters for the company "Nibulon"
Fast and reliable shelter: installation of RPS!
Construction speed of a radiation shelter
Media
All news →News
09.11.2026Read09.11.2026Read09.11.2026Read
How Ukrainian Communities and Schools Can Procure Bomb Shelters Through Prozorro: A Step-by-Step Guide
How a community or school can buy a shelter via Prozorro: needs, market research, requirements, bidding, contract, installation and registration.
Radiation Protection Shelters (PRU) in Ukraine: What They Are, Who Needs Them, and How They Differ from Mobile Shelters
What is an anti-radiation shelter (PRU), what standards govern its construction, how it differs from a shelter and a mobile shelter, and how to build a PRU from modules.
How Long Does It Take to Install a Modular Bomb Shelter in Ukraine? A Timeline from Order to Delivery (Compliant with DSTU/DBN Standards)
Installation of the «Fortetsia» shelter for up to 50 people — up to 24 hours, from delivery to handover — up to 7 days. Stages, site preparation, and documents after installation.