Hobbit House Fortetsia 3.5 9XL shelter completed

Hobbit House Fortetsia 3.5 9XL shelter completed

The project was implemented in line with the client's technical requirements, taking into account site-specific features and logistics. The shelter has the following specifications:

  • Length: 43.53 m
  • Width: 5.23 m
  • Usable area: 134.24 m²
  • Wall, roof, and buttress thickness: 300 mm
  • The structure fully complies with the unified Hobbit House architectural standard.

Fortetsia 3.5 9XL is a solution designed to shelter a large number of people. These modules are used in locations where standardization, rapid installation, and compliance with modern civil defence requirements are crucial.

We continue to develop the next generation of shelters — easy to assemble, adaptable to various needs, and designed to meet not only technical regulations but also the real needs of people.

To request a similar solution or consultation, contact our team. You can also explore our other completed projects on the website.

VIDEO: https://youtu.be/sXYWFfExKu4

Hobbit House Fortetsia 3.5 9XL shelter completed
← All projects
Media

News

All news →
09.11.2026Read

How Ukrainian Communities and Schools Can Procure Bomb Shelters Through Prozorro: A Step-by-Step Guide

How a community or school can buy a shelter via Prozorro: needs, market research, requirements, bidding, contract, installation and registration.
09.11.2026Read

Radiation Protection Shelters (PRU) in Ukraine: What They Are, Who Needs Them, and How They Differ from Mobile Shelters

What is an anti-radiation shelter (PRU), what standards govern its construction, how it differs from a shelter and a mobile shelter, and how to build a PRU from modules.
09.11.2026Read

How Long Does It Take to Install a Modular Bomb Shelter in Ukraine? A Timeline from Order to Delivery (Compliant with DSTU/DBN Standards)

Installation of the «Fortetsia» shelter for up to 50 people — up to 24 hours, from delivery to handover — up to 7 days. Stages, site preparation, and documents after installation.