Hobbit House
EN
+380 67 445 6794Consultation
← All projects
Completed

Fortetsia modular shelters installed at KSE in Kyiv

Fortetsia modular shelters installed at KSE in Kyiv

Two Fortetsia 3.5 (model 4XL) modular reinforced-concrete shelters by Hobbit House have appeared at the Kyiv School of Economics in Kyiv. During air raid alerts, one of them is open to everyone nearby; the other is for those inside the school.

KSE chose the Fortetsia 3.5 in the 4XL configuration — a modular reinforced-concrete shelter assembled from modules directly on site. According to the standards, the two shelters together accommodate up to 140 people at a time.

What's inside: seating, a restroom, ventilation, fire extinguishers and drinking water — everything needed to shelter people during an alert.

Protection: the structure protects against shrapnel and blast waves. The model is certified to DSTU 9329:2025.

During an air raid alert, the shelter open to visitors will serve as the nearest safe point for everyone near Natalka Park and the Obolon embankment in Kyiv.

Battle-tested. Engineer-approved.

Can I order a shelter like this? Yes — tell us about your site and we'll prepare a calculation for your specific location. Shelters for business and institutions.

Fortetsia modular shelters installed at KSE in Kyiv
Fortetsia modular shelters installed at KSE in Kyiv
← All projects
Media

News

All news →
09.11.2026Read

How Ukrainian Communities and Schools Can Procure Bomb Shelters Through Prozorro: A Step-by-Step Guide

How a community or school can buy a shelter via Prozorro: needs, market research, requirements, bidding, contract, installation and registration.
09.11.2026Read

Radiation Protection Shelters (PRU) in Ukraine: What They Are, Who Needs Them, and How They Differ from Mobile Shelters

What is an anti-radiation shelter (PRU), what standards govern its construction, how it differs from a shelter and a mobile shelter, and how to build a PRU from modules.
09.11.2026Read

How Long Does It Take to Install a Modular Bomb Shelter in Ukraine? A Timeline from Order to Delivery (Compliant with DSTU/DBN Standards)

Installation of the «Fortetsia» shelter for up to 50 people — up to 24 hours, from delivery to handover — up to 7 days. Stages, site preparation, and documents after installation.