Hobbit House
EN
+380 67 445 6794Consultation
← Home
Business
Application

Bomb shelters for business

Protect staff without stopping operations. Branding options.

Shelters that fit

We agree the exact model during the consultation — almost the whole range fits.

Fortetsia 4.0 and 6.0 — a shelter your business can work in

The key advantage of Fortetsia isn't "waiting out the alert" — it's a space where business keeps working. Thanks to the modular system and a width of 4–6 metres, there is more usable floor area inside. These are primary mobile shelters (PMU) with certificates of conformity to DSTU 9329:2025, rated at 100 kPa. Trusted by the Kyiv School of Economics, the Victoria Gardens mall and the Superhumans centre; the company is listed in Forbes NEXT 250.

Installation with no downtime / The shelter is assembled from ready reinforced-concrete modules — the site keeps running
Installation with no downtime / The shelter is assembled from ready reinforced-concrete modules — the site keeps running
Protection to DSTU 9329:2025 / Fortetsia 4.0 and 6.0 are rated at 100 kPa
Protection to DSTU 9329:2025 / Fortetsia 4.0 and 6.0 are rated at 100 kPa

Business works inside. A 4- or 6-metre width is enough for workstations, a coffee area and separate zones.

Our Fortetsia primary mobile shelters (PMU) hold certificates of conformity to DSTU 9329:2025 (No. DCS.0002371-26 — Fortetsia 4.0, No. DCS.0002370-26 — Fortetsia 6.0) and already stand at hundreds of sites across Ukraine — including in front-line areas.

Fortetsia 4.0 — 4 m internal width; in the 3XL version (3 modules), 38.8 m².

Fortetsia 6.0 — 6 m internal width; in the 3XL version, 58.2 m².

Capacity is tailored to your site: the shelter is modular, so we extend the length with extra modules.

Advantages
01

Personalized approach

We design and build shelters around your specific needs and requirements

02

High quality and reliability

Our structures meet the highest safety standards and provide reliable protection for your assets

03

Cost-effectiveness

We offer competitive prices and effective solutions for your business

04

Professional approach

You are advised by engineers who run projects from calculation to installation: we will match the model to the number of people, the site and the budget

Documents
Calculator

Preliminary shelter selection

Enter the type of site, the number of people and the ground surface — we will show the model and the number of shelters and modules. No prices here: the engineer calculates the cost for your site.

Type of site
A rough figure is fine — the engineer will refine it.
Placement
Site surface
Individual request

Send us your technical brief

Describe the site and the task or attach a brief, drawings or a site plan — the engineer will prepare a solution and a calculation for your site.

Tap and say it all in one go: your name, phone and what you need.

Brief file
PDF, DOC, DOCX, DWG, JPG, PNG · up to 10 MB
Media

News

All news →
09.11.2026Read

How Ukrainian Communities and Schools Can Procure Bomb Shelters Through Prozorro: A Step-by-Step Guide

How a community or school can buy a shelter via Prozorro: needs, market research, requirements, bidding, contract, installation and registration.
09.11.2026Read

Radiation Protection Shelters (PRU) in Ukraine: What They Are, Who Needs Them, and How They Differ from Mobile Shelters

What is an anti-radiation shelter (PRU), what standards govern its construction, how it differs from a shelter and a mobile shelter, and how to build a PRU from modules.
09.11.2026Read

How Long Does It Take to Install a Modular Bomb Shelter in Ukraine? A Timeline from Order to Delivery (Compliant with DSTU/DBN Standards)

Installation of the «Fortetsia» shelter for up to 50 people — up to 24 hours, from delivery to handover — up to 7 days. Stages, site preparation, and documents after installation.
We will match a solution to your site
Request a consultation