Hobbit House
EN
+380 67 445 6794Consultation
← Home
Media

News

AllNewsShelter installation reports
23.10.2026 · News

Hobbit House Modular Shelters Installed in Zaporizhzhia

Hobbit House "Fortetsia" modular shelters are being installed in Zaporizhzhia along schoolchildren's routes — protecting children and residents. Reinforced concrete, 500 kPa, DSTU 9329:2025.
09.10.2026 · News

Hobbit House Modular Shelters at Kyiv Region Stations

Hobbit House modular shelters are being installed at Kyiv region railway stations to protect passengers. Aboveground Fortetsia, DSTU 9329:2025.
01.10.2026 · News

Happy Day of Defenders of Ukraine

We thank the defenders of Ukraine, men and women, for their strength, resilience and daily service. Thanks to you, we can work, study and make plans.
01.10.2026 · News

Yellow alert level and shelters for business

Since 4 September, Ukraine has two air-raid alert levels. At the yellow level, a business may operate if it has a shelter, dual-purpose structure or safe space — otherwise only until 4 December 2026.
28.09.2026 · News

Latvia: standards for factory-made shelters

Latvia is standardising the procurement of industrially manufactured modular shelters, above-ground and underground. What is changing across Europe, and how Hobbit House already works in Estonia and Poland.
25.09.2026 · News

Above-ground modular shelter in numbers

We explain in plain words every characteristic of an above-ground modular reinforced-concrete shelter (PMU): 500 kPa, 300 mm walls, installation from 8 hours — and compare them with the DSTU 9329:2025 minimum.