Why shelters are on the agenda in Estonia now
The law applies from 1 July 2026
Amendments to the Emergency Act (RT I, 30.12.2025, 20) introduced the terms varjend (shelter), varjumiskoht (shelter place) and varjumisplaan (sheltering plan). Since 1 October 2026 these provisions sit in the Crisis Situations and National Defence Act (KoRkS); technical requirements are set by Government Regulation No. 50.
Deadlines for existing buildings
Buildings covered by the requirement must have a sheltering plan by 1 July 2027 and, where possible, a shelter place by 1 July 2028.
New buildings need a shelter
A public shelter is mandatory in a new public building with a closed net floor area of 10,000 m² or more if the building permit application was filed after 1 July 2026. The non-public shelter requirement covers residential, office, retail, education and healthcare buildings from 1,200 m² and industrial and warehouse buildings from 1,500 m²; check the effective date in Riigi Teataja.
A shelter place can be a separate structure
The explanatory memorandum to the regulation allows a purpose-built structure next to a building or in public space as a shelter place, citing a structure on kindergarten grounds as an example. According to the same memorandum, a shelter may also serve several buildings within 250 m.
Public shelter capacity is limited
According to ERR, in May 2025 Estonia had about 270 public shelter places for roughly 230,000 people. On 1 September 2026 residents of Ida-Viru County and South Estonia received an air threat warning via EE-ALARM.
Who it is for
Municipalities, kindergartens and schools
If the building has no suitable room, a shelter place can be installed as a separate structure on the grounds. We size it for a group or class at 0.75 m² per person and provide technical data, drawings and documents for the tender.
Developers and apartment associations
An apartment association (KÜ) must prepare a sheltering plan and find a shelter place; if the basement is unsuitable, a modular shelter in the yard can be the answer. Developers can use a free-standing structure shared by several buildings within 250 m. The class and compliance are confirmed by an Estonian designer.
Private homes
Above-ground or underground turnkey shelter for a private garden. We help choose the location and prepare data for the construction notice (ehitisteatis) or building permit (ehitusluba) in the Estonian building register (EHR).
Business and critical infrastructure
A shelter next to a plant, warehouse, energy or logistics site so that the shift can take cover close to work. In Ukraine we install shelters next to workshops so that air raid alerts do not stop production.
What Hobbit House offers
Factory-made reinforced concrete
Monolithic reinforced concrete, C35–C45 concrete, 300 mm walls in the above-ground series. Every shelter comes with a technical passport.
Installed in 24 hours
A shelter for up to 50 people is installed in 24 hours; the full cycle from delivery to handover takes 7 days.
Arched roof and buttresses
The arched roof distributes loads better than a flat one and helps deflect fragments. Buttresses keep the structure in place and, in underground installation, take the soil pressure.
Sized to headcount
22 above-ground models of 1–10 modules, the underground Hobbit 2.0 and radiation shelters. We select the model using the Estonian standard of 0.75 m² per person.
Experience
Making shelters since 2022: more than 1,500 sites in 24 regions of Ukraine. Over 70 years of experience with reinforced concrete.
Service life and warranty
Design service life of the structure is 25 years, with a 5-year warranty.
How it works
Enquiry and pre-selection
Send us the site details: building type, number of people, plot location. An engineer proposes a model and layout.
Estonian designer
An Estonian designer assesses whether the solution qualifies as a shelter place or shelter for your building and prepares the design. We provide drawings, technical data and test parameters.
Documents in EHR
Depending on footprint, height and depth, Annex 1 of the Building Code requires a construction notice (ehitisteatis) or a building permit (ehitusluba). Applications are filed in the building register (EHR); we help prepare the documents.
Factory production
Modules are made of reinforced concrete at the factory. Each shelter comes with a technical passport.
Delivery and installation
Modules are delivered to the site and placed by crane. A shelter for up to 50 people is installed in 24 hours.
Handover
We hand over the shelter and documents; the shelter place is entered in the building's sheltering plan. Delivery to handover takes 7 days.
Certification, honestly
Hobbit House shelters are certified to the Ukrainian standard DSTU 9329:2025, the company holds ISO 9001 and ISO 14001 certificates, and EN certification is in progress. A Ukrainian certificate does not replace a compliance assessment in Estonia: whether the solution qualifies as a shelter place for your building is assessed and confirmed by an Estonian designer. A V1 or V2 class shelter additionally requires a door, airlock and ventilation certified for shelter use. Test parameters, drawings and technical data are available on request.
Shelter price
The price depends on the model and number of modules, above-ground or underground installation, equipment (door, ventilation, fit-out), transport and crane work, foundation, soil and groundwater, and design. Prices are on request, in EUR. The preliminary estimate is free.
FAQ
What is the difference between a varjend and a varjumiskoht?
A varjend (shelter) is required in new buildings and must meet class V1 or V2 under Regulation No. 50. A varjumiskoht (shelter place) is the solution for existing buildings: according to the explanatory memorandum it must protect at least against fragments and allow a stay of up to about 12 hours. Hobbit House modules are a candidate solution primarily for a shelter place.
Does a Hobbit House shelter meet Estonian requirements?
The shelters are certified to the Ukrainian DSTU 9329:2025 standard and EN certification is in progress. Compliance with Estonian requirements for a specific site is confirmed by an Estonian designer. We give the designer all technical data and help prepare the documents.
How much does a modular shelter cost?
Prices are on request, in EUR. The cost depends on the model, installation method, equipment, transport and groundworks. The preliminary estimate is free.
Do I need a building permit or a construction notice?
It depends on the structure's footprint, height and depth (Annex 1 of the Building Code). Confirm the requirement with your local municipality. Applications are filed in the building register (EHR), and we help prepare the documents.
How many people fit in a shelter?
The Estonian standard is 0.75 m² per person, excluding technical rooms. The above-ground series has 22 models of 1–10 modules; we calculate the right size for your headcount.
How quickly can a shelter be installed?
A shelter for up to 50 people is installed in 24 hours; the full cycle from delivery to handover takes 7 days. Production and delivery schedules are agreed per site.
Can a grant cover the shelter?
According to ERR, the KredEx (now EIS) renovation grant can also be used to build a shelter place. The Rescue Board (Päästeamet) has offered apartment associations support for adapting shelter places via RTK; check current terms on rtk.ee. We provide a quote and technical data for the application.
Can a modular shelter be placed on kindergarten or school grounds?
The explanatory memorandum to the regulation gives a free-standing structure on kindergarten grounds as an example of a shelter place. The location and solution are confirmed by an Estonian designer and the local municipality.