Hobbit House
EN
+380 67 445 6794Consultation
← Home
Hobbit House

Modular reinforced-concrete shelters delivered to Poland

Hobbit House is a Ukrainian manufacturer of precast reinforced-concrete shelters. We deliver ready-made modules of the above-ground Fortetsia series and the underground Hobbit 2.0 to Poland, for 6 to 210 people, and install a shelter for up to 50 people in 24 hours. The protection category under Polish rules is confirmed by a licensed Polish designer; we help prepare the documents.

Request a shelter quote for Poland

Why Poland is building shelters now

Civil Protection Act in force since 1 January 2025

The Act of 5 December 2024 on civil protection and civil defence (Dz.U. 2024 poz. 1907) defines three types of facility: schron (sealed shelter), ukrycie (protective shelter) and MDS (temporary shelter space). According to the Ministry of the Interior (MSWiA), owners can receive grants of up to 100% of construction or conversion costs.

Categories U-1 to U-3 and S-1 to S-3 since November 2025

The MSWiA regulation of 4 November 2025 (Dz.U. 2025 poz. 1548) sets technical conditions for protective structures: shelter categories U-1 to U-3 and S-1 to S-3, at least 1 m² per person, and fire-resistance requirements. Categories S-2 and S-3 apply to underground structures only.

Home shelters up to 35 m² by notification

An amendment to the Construction Law (Dz.U. 2025 poz. 1847) introduced, from January 2026, a notification procedure (zgłoszenie) for a detached protective structure of up to 35 m² serving the residents of a single-family house. A design must be submitted with the notification.

Funding for municipalities: 2026 and the 2027–2031 programme

PLN 2.4–2.6 billion was earmarked for protective structures in 2026, and about PLN 1.2 billion had been contracted by 10 September 2026 (Spidersweb, citing MSWiA). On 6 October 2026 the government adopted a 2027–2031 programme worth over PLN 102 billion.

New obligations for developers and investors

New multi-family and public buildings with permit applications filed after 31 December 2025 must include temporary shelter spaces (Murator). Since 29 May 2026, investors in offices, hotels and shopping centres notify the municipality, which has 45 days to set the shelter's capacity and category (Art. 95a of the Act).

Shelters for municipalities, developers, businesses and homes

Municipalities, schools and kindergartens

Ready-made modules can be ordered and placed quickly next to a school, a kindergarten or in a public space, which helps municipalities spend civil-protection funds within the budget year. We supply technical data and a description of the procurement subject for a request for quotations or a tender.

Detached shelters for developers and housing communities

When a building lacks space, or the MDS or Art. 95a requirements are hard to meet in a cast-in-place structure, a detached concrete module in the courtyard can be a complementary solution. Your designer verifies the category and capacity set by the municipality; we provide the structural documentation.

Home shelters

For a single-family house we offer compact models: the above-ground Fortetsia 2.25 XL (external dimensions 5,930 × 3,980 mm) and the underground Hobbit 2.0. We help you gather the data needed for the design and the notification to the county office.

Business and critical infrastructure

Staff shelters for plants, warehouses, fuel stations or energy sites go up without a lengthy build: a shelter for up to 50 people is installed in 24 hours. Modules can be dismantled and relocated, which matters on leased land.

Shelters that fitFortetsia shelter catalogue

Why Hobbit House precast concrete

Factory-made reinforced concrete

Fortetsia modules have 300 mm reinforced-concrete walls in C35–C45 concrete. The arched roof and buttresses distribute loads better than a flat slab.

Ready modules, not a construction site

The shelter is produced at the factory and arrives as finished modules. The above-ground series needs no deep excavation and no concrete work on site.

Installed in 24 hours

A shelter for up to 50 people is installed in 24 hours (without interior finishing). The full cycle from delivery to handover takes 7 days.

Relocatable above-ground shelter

Modules can be dismantled and set up elsewhere — we carry out dismantling and relocation. Useful on leased land or when a business moves.

From 6 to 210 people

The above-ground series includes 22 models 2.25, 3.5, 4.0 and 6.0 m wide, plus twin structures. Equipment such as ventilation, toilet, air conditioning, benches and spaces for people with reduced mobility is configured to the task.

Proven in wartime

We have produced shelters since 2022 and worked with reinforced concrete for over 70 years. More than 1,500 projects completed across all 24 regions of Ukraine. Design service life is 25 years; warranty is 5 years.

How delivery to Poland works

01

Request

Tell us about the site, the number of people, the purpose and the timeline. We reply within one business day, in Polish, English, Ukrainian or Russian.

02

Selection and quote

An engineer selects the model and equipment, checks access and the base, and prepares a quote in PLN or EUR. The preliminary estimate is free of charge.

03

Documents with a Polish designer

We hand over the structural documentation and help prepare the documents for notification or a permit. The U/S category and capacity under Polish rules are confirmed by a licensed Polish designer.

04

Production

Modules are manufactured at our plant in the Kyiv region. The production time is stated in the offer.

05

Delivery and crane

Modules travel by road and are placed by crane. The site needs crane access, a prepared base and utility connections.

06

Installation and handover

We install the shelter, connect the equipment and hand it over with its technical passport. From delivery to handover takes 7 days.

Certification and Polish categories: the honest picture

Our shelters hold certificates of conformity with the Ukrainian standard DSTU 9329:2025, and the company holds ISO 9001 and ISO 14001 management-system certificates. Certification to EN standards is in progress. A Ukrainian certificate does not assign a category under the Polish regulation (Dz.U. 2025 poz. 1548): the category of an ukrycie or schron is set by the design and calculations of a licensed Polish designer, and we help prepare them. Test parameters are available on request. Under Polish law, above-ground models without sealing and filtered ventilation are an ukrycie, not a schron.

Shelter price: what it depends on

The price depends on the model and capacity, above-ground or underground installation, equipment (ventilation, filtration, toilet, air conditioning, power), base preparation, transport from Ukraine, crane work and installation, and design documentation in Poland. Prices are quoted on request in PLN or EUR, with a clear list of what is included. For context, Polish media market reviews (bezprawnik.pl, kb.pl) cite figures from several tens of thousands to over PLN 200,000 for ready-made precast shelters.

FAQ

Is it a schron or an ukrycie?

Under the Polish Act, a schron is sealed and has filtered ventilation; an ukrycie does not. The above-ground Fortetsia in its standard configuration is a reinforced-concrete ukrycie. The final classification and category are set by a Polish designer.

Does the shelter meet Polish U/S categories? Who confirms it?

The category under Dz.U. 2025 poz. 1548 is confirmed by the design and calculations of a licensed Polish designer, not by a manufacturer's certificate. We supply the structural documentation and test parameters to support that assessment.

Do you have European certification?

Certification to EN standards is in progress. We currently hold certificates of conformity with DSTU 9329:2025 and ISO 9001 and ISO 14001 certificates.

How much does a shelter cost with delivery and installation in Poland?

We prepare an individual quote in PLN or EUR, based on the model, equipment, distance, site access and documentation. The offer states what is included and what stays with the client, such as the base or utility connections.

Do I need a building permit?

It depends on the structure and the investor. For a detached home protective structure of up to 35 m² at a single-family house, the law provides a notification procedure with a design. Businesses and municipalities usually follow the standard procedure. Your designer determines the route; we help with the documents.

What access and crane are needed?

You need access for the crane and truck, a prepared base and utility connections. Module weights and crane requirements are given in the offer for the specific model.

Can the shelter be moved?

Yes. The above-ground series is installed without permanent construction, and dismantling and relocation are among our services.

Are there grants for private individuals?

We have not found a grant programme for private home shelters. Civil-protection funds go to owners of protective structures and to local authorities, including municipalities.

Request a shelter quote for Poland

Tell us where the shelter will stand and how many people it must hold. An engineer will call within one business day, select a model and prepare a free preliminary estimate in PLN or EUR.

Tap and say it all in one go: your name, phone and what you need.

Reply within one business day