Why demand for shelters is growing in Lithuania
New buildings must have a shelter
Under STR 2.07.02:2024, a shelter (priedanga) is mandatory in new public buildings with more than 100 people present at once and in residential buildings over 5 storeys. If it does not fit inside or under the building, it can be built as a separate structure next to it.
Public funding is available
The Ministry of the Interior's shelter programme has EUR 77 million through 2030, including EUR 12 million in 2025; municipalities apply. The State Defence Fund plans about EUR 25 million a year for multi-purpose shelters (LRT, May 2026).
Target: shelter for 60% of residents
By 2027, shelters must cover 60% of the population. In July 2026 there were 6,618 of them, enough for about 58%. A National Audit Office review found that 91% of shelters are not accessible to people with disabilities.
The 2026 air-raid alerts
On 20 May 2026 a drone-related air-raid alert was declared in Vilnius, followed by further alerts in September, October and November. After each one, LRT and other media reported locked or unprepared shelters, especially in villages without basements.
Who our shelters are for
Municipalities, schools and kindergartens
A stand-alone modular shelter in a school yard or a village with no suitable basements. Many models include places for people with reduced mobility, and we supply technical data for procurement specifications and market consultations.
Developers
STR 2.07.02:2024 allows the shelter to be built as a separate structure next to a new apartment block or public building. You keep your underground car park, and your designer gets our drawings and calculations.
Private homes and farmsteads
An above-ground or underground home shelter for 6 people or more. In peacetime it works as a storeroom or cellar, and for the underground option we handle earthworks and waterproofing on a turnkey basis.
Businesses and infrastructure
A shelter for staff next to the workshop, warehouse or office, so work does not have to stop during an alert. We size it to your shift, up to 210 people in a single structure.
Why Hobbit House
Monolithic reinforced concrete
C35–C45 concrete and 300 mm walls in the Fortetsia series. The arched roof and buttresses spread the load and keep the structure from overturning.
Installed in 24 hours
A shelter for up to 50 people is installed in 24 hours; the full cycle from delivery to handover takes 7 days.
From 6 to 210 people
22 above-ground models with 1 to 10 modules, the underground Hobbit 2.0 and radiation shelters. Many models include places for people with reduced mobility.
More than 1,500 sites
We have been making shelters since 2022, building on more than 70 years of reinforced-concrete experience. Our shelters stand in every region of Ukraine.
25-year service life, 5-year warranty
The structure has a design service life of 25 years and a 5-year warranty. A technical passport is handed over with the product.
Dual use and relocation
In peacetime the shelter can serve as a storeroom or utility room. If needed, we dismantle it and move it to a new site.
How it works
Request
Tell us how many people need protection, where the site is and your timeline. An engineer will get back to you within one working day.
Selection and quote
We choose the model and configuration and prepare a preliminary price in euros, with and without VAT. The preliminary estimate is free.
Local documents with a Lithuanian designer
A designer certified in Lithuania prepares the project and assesses compliance with local requirements. We supply drawings, calculations and technical data and help prepare the documents for the municipality.
Manufacturing
We cast the monolithic reinforced-concrete modules at our own plant to the approved configuration.
Delivery and crane
We deliver the modules to site and set them with a crane. The site needs crane access and a prepared base; we agree this in advance.
Installation and handover
We install the shelter, connect the building services and hand it over together with its technical passport.
Certification: what we can confirm
Hobbit House shelters hold certificates of conformity with the Ukrainian standard DSTU 9329:2025, and the company's management systems are certified to ISO 9001 and ISO 14001. EU (EN) certification is in progress. Compliance with Lithuanian requirements, including STR 2.07.02:2024, is assessed and confirmed for each site by a designer certified in Lithuania; we provide the calculations, drawings and other data they need. Test parameters are available on request.
How much does a shelter cost?
The price depends on capacity and model, the number of modules, equipment (power, ventilation, doors, toilet, finishing), above-ground or underground installation, base preparation, distance and crane. We quote in euros on request, always with and without 21% VAT. For market context: Lithuania's first modular shelter, in Garliava (about 100 m², July 2026), cost EUR 186,340 turnkey, roughly EUR 1,860 per m² (reform.news).
FAQ
Does your shelter comply with STR 2.07.02:2024?
Compliance for a specific site is assessed and confirmed by a designer certified in Lithuania; nobody can promise it in general terms without a project. We give the designer our drawings, calculations and technical data and help prepare the documents.
Do you have CE marking or EN certificates?
Not yet. The shelters are certified to the Ukrainian standard DSTU 9329:2025, the company to ISO 9001 and ISO 14001, and EU (EN) certification is in progress. Test parameters are available on request.
How much does a bomb shelter in Lithuania cost with delivery and installation?
It depends on capacity, equipment, installation method and distance to the site. We prepare a quote in euros, with and without VAT, on request; the preliminary estimate is free.
Do I need a building permit for a shelter on my plot?
That depends on the structure category, its area, depth and location (urban area, protected zones). The designer and the municipality's architecture department make the final call. We help prepare the documents.
How quickly can you install a shelter?
A shelter for up to 50 people is installed in 24 hours, and handover follows within 7 days of delivery. Production time and the required crane are stated in the quote, as they depend on the model and number of modules.
Is the shelter accessible to people with disabilities?
Many models include places for people with reduced mobility: for example, the Fortetsia 3.5 4XL holds up to 78 people, 4 of them with reduced mobility. Entrance accessibility is agreed at the design stage.
Can a municipality get funding for a modular shelter?
Municipalities apply to the Ministry of the Interior's programme (EUR 77 million through 2030). We cannot guarantee funding, but we provide the technical data needed for the application and the procurement.
Does it work where the groundwater level is high?
For underground shelters we check groundwater level and depth and install waterproofing. Where water is close to the surface, an above-ground shelter is usually the better choice.
Get a quote for your site
Tell us the number of people, the site location and your timeline. An engineer will select a model, price it in euros and contact you within one working day.