Hobbit House
EN
+380 67 445 6794Consultation
← Home
Media

News

AllNewsShelter installation reports
25.09.2026 · News

Above-ground modular shelter in numbers

We explain in plain words every characteristic of an above-ground modular reinforced-concrete shelter (PMU): 500 kPa, 300 mm walls, installation from 8 hours — and compare them with the DSTU 9329:2025 minimum.
21.09.2026 · News

5 questions about shelters at MSPO 2026

8-hour installation, T-72 tank test, keeping a plant running during alerts, dual purpose, EU standards — a Hobbit House engineer answers the top questions from visitors at MSPO 2026 in Kielce.
13.09.2026 · News

Dual-purpose shelters

Dual-purpose shelters by Hobbit House: the space works every day and protects people during an alert. Reinforced concrete 500 kPa, certified to DSTU 9329:2025.
03.09.2026 · News

Buy a modular shelter from the manufacturer — Hobbit House

What to know before buying a modular shelter: why the manufacturer matters, which documents to check and how the process works. Hobbit House experience.
01.09.2026 · News

Hobbit House at MSPO 2026 in Poland

Hobbit House at MSPO 2026 (8–11 September, Kielce, Poland). Presenting Ukrainian modular protective structures and critical infrastructure protection solutions.
27.08.2026 · News

How to choose a civil-defence shelter: 7 criteria

How to choose a reliable civil-defence shelter: certification, testing, type, ventilation, installation and manufacturer. 7 criteria to get it right.