Hobbit House
EN
+380 67 445 6794Consultation
← Home
Infrastructure
Application

Shelters for infrastructure

Protection for fuel stations, power plants, tanks and transformers.

Shelters that fit

We agree the exact model during the consultation — almost the whole range fits.

Protection where a permanent shelter cannot be built quickly

Railways, filling stations, substations and water utilities keep working during air-raid alerts. The people next to them need a safe place now, not after a year of construction.

A modular shelter is made at our plant and installed on a prepared base next to the operating facility, so its work does not stop.

Above-ground Fortetsia shelters are reinforced concrete with 300 mm walls and DSTU 9329:2025 certificates of conformity. Fortetsia 2.25 and 3.5 withstood 500 kPa in a field test; Fortetsia 4.0 and 6.0 are designed for 100 kPa.

Railway stations in Kyiv region / Fortetsia shelters for passengers and railway staff, 2026
Railway stations in Kyiv region / Fortetsia shelters for passengers and railway staff, 2026
Manufacturing plant / Fortetsia 2.25: walls, roof and buttresses 300 mm thick
Manufacturing plant / Fortetsia 2.25: walls, roof and buttresses 300 mm thick

Our shelters already protect people at infrastructure facilities.

Railway stations in Kyiv region (2026): the first Fortetsia shelter holds 29 people at a time, and installation continues at other stations in the region.

Fast-food restaurant chain, Kyiv region: Fortetsia 3.5 2XL with 20 m² of protected space for 34 people.

Manufacturing plant: a Fortetsia 2.25 installed on a tight schedule as a shelter for workers next to the shop floor.

Why a modular shelter
01

Installed next to an operating site

Ready-made modules are placed on a prepared base while the facility keeps working.

02

Short lead times

Installing a shelter for up to 50 people takes 24 hours; the full cycle from delivery to handover takes 7 days.

03

Capacity to fit your site

The shelter is modular: length and capacity grow with additional modules.

04

Documents for the client

DSTU 9329:2025 certificates, LIRA CAD structural calculations and participation in Prozorro tenders.

Documents
Media

News

All news →
09.11.2026Read

How Ukrainian Communities and Schools Can Procure Bomb Shelters Through Prozorro: A Step-by-Step Guide

How a community or school can buy a shelter via Prozorro: needs, market research, requirements, bidding, contract, installation and registration.
09.11.2026Read

Radiation Protection Shelters (PRU) in Ukraine: What They Are, Who Needs Them, and How They Differ from Mobile Shelters

What is an anti-radiation shelter (PRU), what standards govern its construction, how it differs from a shelter and a mobile shelter, and how to build a PRU from modules.
09.11.2026Read

How Long Does It Take to Install a Modular Bomb Shelter in Ukraine? A Timeline from Order to Delivery (Compliant with DSTU/DBN Standards)

Installation of the «Fortetsia» shelter for up to 50 people — up to 24 hours, from delivery to handover — up to 7 days. Stages, site preparation, and documents after installation.
We will match a solution to your site
Request a consultation